Products


Used for multistage fracturing and to expand the area of completion

Equipment kit KOUS-MS-GRP-U used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS-MS-GRP-UP used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS-MS-GRP-UDP used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS–МS–GRP–UDP(М) used for multistage fracturing and to expand the area of completion.

Equipment Kit KOUS-DPK GRP-SО

Used for selective fracturing, cement plugging operations, acidizing, formation testing and casing leak detection.

Used to facilitate a high-volume circulation of fracturing fluid.

Provides isolation of the tubing string in overpressure conditions.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Used for isolation of formations and cross flows, in multistage fracturing operations and other open-hole and production-related interventions. Swelling and sealing are achieved through exposure of elastomer to wellbore fluids (oil, water or both). Can be used in open-hole and cased hole wells.

Provides isolation of zones, prevents cross flows and allows multistage fracturing. Packer is lowered in the well as a part of the casing string to be set in the open hole or in the cased wellbore.

Used for cementing and sealing the liner in the casing of deviated and horizontal wells.

Provides tight connection of the tubing in the polished packer bore receptacle of the liner hanger.

Used for fracturing at the setting depth. Fracturing sleeve is installed in the noncemented liner assembly of deviated and horizontal wells.

Equipment Kit KOUS-PK-GL

Used in gas, gas condensate and oil producing wells.

Equipment Kit KPO 114-168/142-21 K1 KhL

Equipment Kit KPO 114-168/142-21 K1 KhL used in flowing oil, gas and gas condensate wells.

Equipment Kit KOUS-DPK-DLK-ORE

Used for dual completion in gas and gas condensate wells.

Provides communication between the tubing and the annulus.

Serves to open and close circulating valve.

Serves to open and close circulating valve.

Designed for pressure equalization between the annulus and the tubing.

Provides communication between the annulus and the tubing during well testing and completion.

Allows for individually regulated volumes of fluid be injected into two isolated zones through a single tubing string.

Provides communication between the annulus and the tubing.

Provides fluid (gas) circulation between the annulus and the tubing during well interventions.

Provides isolation of concentric tubing strings during dual completion.

Provides withdrawal of gas in wells with high annulus pressure and reduces backpressure.

Enables pressure testing of the tubing or drilling string.

Provides temporary isolation of the tubing string to allow circulation or chemical injection below.

Designed for injection of chemicals in the tubing string or in the annulus.

Helps to set a packer (or a multiple packer assembly) when tubing weight can't be conveyed to the packer or setdown weight is not sufficient (at low depths).

Isolates the formation from brine or other weighted completion fluids during remedial work on ESPs.

Enables disconnection of the tubing string from the packer.

Provides means of retrieving the production string without unsetting the companion packer below as well as sealed reconnection to the packer.

Enables automatic disconnection (reconnection) of the tubing string from (to) the packer.

Used to remove debris from the bottom of the well (sand, scale, solid particles).

Used to remove debris from the bottom of the well (sand, scale, solid particles).

Serves to house retrievable chemical injection mandrels, dummy valves and other downhole tools.

Designed to effectively remove metal objects, hard-alloy teeth of roller-cone bits and other ferrous debris from the bottom of oil and gas wells.

Designed for safe release of the tubing from the downhole tools below should they become stuck.

Designed to remove debris from the mud and protect the drilling string as well as to prevent any foreign material from entering the drilling string during replacement of drill pipes and tools.

Designed to protect critical downhole equipment from debris (sand, scale, solid particles) and to catch foreign materials (lost cable bands, etc.) during subsurface pump replacement.

Provides controllable isolation of the tubing bore in case of emergency or during well interventions..

Provides unrestricted re-entry of subsurface or wireline (logging) tools into the tubing string.

Designed to accommodate any changes in tubing string length caused by temperature and pressure.

Equipment Kit KOUS-DPK (A)

Designed for dual completion applications with isolation of perforated or disturbed casing section above the assembly.

Equipment Kit KOUS-PK (A) K-UG

Designed to be used in horizontal wells and to set packer assembly in shallow wells.

Equipment Kit KOUS-DPK (A) K-UG

Used to protect production casing from fluid injected with inverted ESP.

1 2
Equipment search
For equipment search you are to select at least one item of the form. For a more precise search, you must specify the maximum number of parameters.