Products


Used to facilitate a high-volume circulation of fracturing fluid.

Provides isolation of the tubing string in overpressure conditions.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Allows for long-term isolation of zones in the production string and protects the production string from dynamic and hostile downhole conditions in the course of bottomhole zone treatment.

Used for isolation of formations and cross flows, in multistage fracturing operations and other open-hole and production-related interventions. Swelling and sealing are achieved through exposure of elastomer to wellbore fluids (oil, water or both). Can be used in open-hole and cased hole wells.

Provides isolation of zones, prevents cross flows and allows multistage fracturing. Packer is lowered in the well as a part of the casing string to be set in the open hole or in the cased wellbore.

Used for cementing and sealing the liner in the casing of deviated and horizontal wells.

Provides tight connection of the tubing in the polished packer bore receptacle of the liner hanger.

Used for fracturing at the setting depth. Fracturing sleeve is installed in the noncemented liner assembly of deviated and horizontal wells.

Used for multistage fracturing and to expand the area of completion

Equipment kit KOUS-MS-GRP-U used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS-MS-GRP-UP used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS-MS-GRP-UDP used for multistage fracturing and to expand the area of completion.

Equipment kit KOUS–МS–GRP–UDP(М) used for multistage fracturing and to expand the area of completion.

Equipment Kit KOUS-DPK GRP-SО

Used for selective fracturing, cement plugging operations, acidizing, formation testing and casing leak detection.

Equipment Kit KOUS-DPK (A)

Designed for dual completion applications with isolation of perforated or disturbed casing section above the assembly.

Equipment Kit KOUS-PK (A) K-UG

Designed to be used in horizontal wells and to set packer assembly in shallow wells.

Equipment Kit KOUS-DPK (A) K-UG

Used to protect production casing from fluid injected with inverted ESP.

Equipment Kit KOUS-PK (F)

Enables intrawell injection from an upper water production zone into lower payzones with inverted ESP.

Equipment Kit KOUS-PVM-О (KV)

Provides ESP completion with isolation of disturbed sections of production casing.

Equipment Kit KOUS-PVM-О (KV) М

Provides ESP completion with isolation of disturbed sections of production casing.

Equipment Kit KOUS-PVM-O (KV) ORD

Used for single tubing dual completion.

Equipment Kit KOUS-PVM-О (KV) ORD-DS

Designed for dual production from the wells which have significantly different reservoir properties of the formations and petroleum characteristics.

Equipment Kit KOUS-PM-A1 (F) ORD

Allows single tubing dual completion in the formations with significantly different reservoir properties.

Equipment Kit KOUS-PK-ORD (KP) M

Used for single tubing dual completion with single ESP.

Equipment Kit KOUS-DL-ORZ

Used for dual injection through concentric tubing strings.

Equipment Kit KOUS-DPK-ORZ/D

Used for dual-zone selective completion through concentric tubing strings with injection in the upper zone and production in the lower zone.

Equipment Kit KOUS-DPK-DL-ORZ/D (KV)

Used for dual-zone selective completion through concentric tubing strings with injection in the upper zone and production in the lower zone.

Equipment Kit KOUS-ORZ-DPK (KS)

Used for single string dual injection.

Equipmemt Kit KOUS-DPK (KV) VSP

Designed for single string intrawell injection with water produced from the lower aquifer and injected in the upper reservoir.

Equipment Kit KOUS-TPK-VSP

Used for single string intrawell injection with water produced from the upper aquifer and injected in the lower reservoir.

Equipment Kit KOUS-TPK (A)

Designed for long-term ESP-completion and isolation of previously perforated casing sections.

Equipment Kit KOUS-TPK-SO

Used for selective stimulation or dual well testing with different fluid.

Equipment Kit KOUS-DPK-ORZ (KZ)

Used for single string dual injection.

Equipment Kit KOUS-DPK-ORZ (KZ) M

Used for single string dual injection.

Equipment Kit KOUS-DPK-ORZ (KP) M

Used for single string dual injection.

Equipment Kit KOUS-PM-A1 (F) KO

Isolates the formation from brine or other kill weight fluids during ESP changeover.

Designed for pressure equalization between the annulus and the tubing.

Provides communication between the tubing and the annulus.

Serves to open and close circulating valve.

Serves to open and close circulating valve.

Provides communication between the annulus and the tubing during well testing and completion.

Allows for individually regulated volumes of fluid be injected into two isolated zones through a single tubing string.

Provides communication between the annulus and the tubing.

Provides fluid (gas) circulation between the annulus and the tubing during well interventions.

Provides isolation of concentric tubing strings during dual completion.

Provides withdrawal of gas in wells with high annulus pressure and reduces backpressure.

Enables pressure testing of the tubing or drilling string.

Provides temporary isolation of the tubing string to allow circulation or chemical injection below.

1 2
Equipment search
For equipment search you are to select at least one item of the form. For a more precise search, you must specify the maximum number of parameters.